Revision history of "Instrukcja Train Driver 2 (instrukcje kolejowe)/en"

Jump to navigation Jump to search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 08:50, 26 March 2022Eugenio07 (talk | contribs). . (160,673 bytes) (-32). . (Utworzono nową stronę "==== Semaphore ==== It's a train signal to steer with the railway traffic which shows visually signals which forbid or permit the ride.")
  • (cur | prev) 08:48, 26 March 2022Eugenio07 (talk | contribs). . (160,705 bytes) (-84). . (Utworzono nową stronę "=== Trackside signals === With signals there'll be given orders and commandations which have impact on railway traffic. On PKP network there are used following signal d...")
  • (cur | prev) 08:41, 26 March 2022Eugenio07 (talk | contribs). . (160,789 bytes) (+5,789). . (Utworzono nową stronę "== Signaling (E1) == ''"In this chapter you'll find out about the most important railway rules even if you've never come into contact with them."''")
  • (cur | prev) 12:18, 9 February 2021Argeos (talk | contribs). . (155,000 bytes) (+7). . (Utworzono nową stronę "[https://www.plk-sa.pl/files/public/user_upload/pdf/Akty_prawne_i_przepisy/Instrukcje/Wydruk/Ie_1_-_obowiazuje_od_05.06.2020.pdf PKP PLK signalling instruction as PDF fi...")
  • (cur | prev) 12:17, 9 February 2021Argeos (talk | contribs). . (154,993 bytes) (-17). . (Utworzono nową stronę "This instruction can help you with learning instruction of signalling (E1) and about dispatching/routing (R1) on PKP PLK railway network.")
  • (cur | prev) 11:58, 9 February 2021Pepsi2026 (talk | contribs). . (155,010 bytes) (+155,010). . (Utworzono nową stronę ".")