Translations:Zabudowa i konfigurowanie wpisów wykolejnic/14/en

Z Train Driver 2
Przejdź do nawigacji Przejdź do wyszukiwania

The installation of a double derailer requires the use of a prefabricated derailer and a prefabricated derailer _belka_. Both prefabricated elements are named identically to ensure the correct operation of the double derailer (enter the same derailer name in the upper window for each prefabricated element). Pic. 8 shows the installation of a double derailer on the left, uncoupled with another drive.